Who CPC40920 is for.
training.gov.au describes CPC40920 as reflecting the role of an experienced plumbing service operator with advanced technical skills or responsibility for project design and supervision, or a hydraulic consultant who designs hydraulic systems. Occupational titles include plumbing contractor and hydraulic designer.
For the operations stream, there's an entry requirement: you must hold a Certificate III in Plumbing, or be authorised to do plumbing work by an Australian regulator or licensing body. This isn't a first qualification. It's the next step for qualified plumbers.
It suits plumbers who:
- run jobs, price work and deal with builders and clients
- supervise apprentices and other tradespeople
- design and size drainage, water, sanitary or gas systems
- want to move from a tradesperson certificate to a contractor licence
What's in CPC40920.
CPC40920 has 15 units: 10 core units and 5 electives. The electives follow different rules depending on the award. For the Operations award, you need at least 1 elective from Group B, with the remaining 4 from Group A or Group B. For Hydraulic services design, the electives come from Group A and can't come from Group B. In both, 2 units may be replaced by units from other training packages or accredited courses at Certificate IV level and above. In NSW, the licence page lists the Operations award, so plumbers aiming for a licence need their electives to make up that award.
These are the core units:
| Code | Unit |
|---|---|
| BSBESB402 | Establish legal and risk management requirements of new business ventures |
| CPCCBC4012 | Read and interpret plans and specifications |
| CPCPCM4011 | Carry out work-based risk control processes |
| CPCPCM4012 | Estimate and cost work |
| CPCPCM4015 | Access and interpret regulatory requirements for the plumbing and services industry |
| CPCPDR4011 | Design and size sanitary drainage systems |
| CPCPDR4012 | Design and size stormwater drainage systems |
| CPCPGS4011 | Design and size consumer gas installations |
| CPCPSN4011 | Design and size sanitary plumbing systems |
| CPCPWT4011 | Design and size heated and cold-water services and systems |
How your work lines up.
| Work you do | Units it relates to |
|---|---|
| Quoting and pricing jobs | CPCPCM4012 Estimate and cost work |
| Working through plans and specifications | CPCCBC4012 Read and interpret plans and specifications |
| Sizing drainage for new work | CPCPDR4011 Design and size sanitary drainage systems, CPCPDR4012 Design and size stormwater drainage systems |
| Sizing hot and cold water services | CPCPWT4011 Design and size heated and cold-water services and systems |
| Gas installations | CPCPGS4011 Design and size consumer gas installations |
| Running the business side | BSBESB402 Establish legal and risk management requirements of new business ventures |
| Staying on top of codes and compliance | CPCPCM4015 Access and interpret regulatory requirements for the plumbing and services industry |
CPC40920 and the NSW contractor licence.
NSW needs a licence or certificate for any plumbing, draining or gasfitting work, whatever it costs. For a contractor licence or qualified supervisor certificate, NSW lists Certificate IV in Plumbing and Services (Operations), CPC40920 or later, plus at least two years of eligible, paid experience. The licence is a separate application to Building Commission NSW, and the experience is assessed with it. For the full rules, see the Plumbing Contractor Licence requirements.
Evidence that helps.
- quotes, estimates and invoices you've prepared
- plans, hydraulic drawings and sizing calculations you've worked from or produced
- compliance certificates and inspection paperwork
- evidence of supervising apprentices or other trades
- your Certificate III in Plumbing or current licence details
- references from contractors you've worked for
The electives.
These are the electives on the qualification's list, with their groups. The pathway you're on decides which you can choose.
| Code | Unit | Group |
|---|---|---|
| BSBESB403 | Plan finances for new business ventures | Group A |
| CPCCBC4002 | Manage work health and safety in the building and construction workplace | Group A |
| CPCCBC4019 | Apply sustainable building design principles to water management systems | Group A |
| CPCCBC4024 | Resolve business disputes | Group A |
| CPCPCM4013 | Produce 2-D architectural drawings using design software | Group A |
| CPCPDR4013 | Design and size domestic treatment plant disposal systems | Group A |
| CPCPPS5033 | Design vacuum sewerage systems | Group A |
| CPCPFS4024 | Design residential fire sprinkler systems | Group A |
| CPCPMS4011 | Design, size and lay out heating and cooling systems | Group A |
| CPCPMS4023 | Design compressed air systems | Group A |
| CPCPRF4011 | Design and size roof drainage systems | Group A |
| CPCPCM2043 | Carry out WHS requirements | Group B |
| CPCPDR3023 | Install on-site domestic wastewater treatment plants and disposal systems | Group B |
| CPCPFS3037 | Install residential life safety sprinkler systems | Group B |
| CPCPFS4021 | Commission domestic and residential fire suppression sprinkler systems | Group B |
| CPCPGS3053 | Disconnect and reconnect Type A gas appliances | Group B |
| CPCPGS4022 | Service Type A gas appliances | Group B |
| CPCPGS4023 | Install, commission and service Type B gas appliances | Group B |
| CPCPMS4022 | Commission air and water systems | Group B |
| CPCPWT3022 | Install and commission water heating systems and adjust controls and devices | Group B |
| CPCPWT3027 | Install backflow prevention devices | Group B |
| CPCPWT4022 | Commission and maintain backflow prevention devices | Group B |
| CPCPWT4023 | Commission and maintain hot and heated water temperature control devices | Group B |
| UEERL0004 | Disconnect-reconnect electrical equipment connected to low voltage (LV) installation wiring | Group B |
For a NSW contractor licence, your electives need to make up the Operations award. We'll help you choose units that match the work you do.
How RPL works for plumbers.
Start with a Free Skills Review. We then help you confirm the pathway and electives and gather evidence for each unit. A partner RTO assesses your evidence, which can include questions about your design and sizing decisions. Gap training may be needed where your work hasn't covered a unit, for example a design unit for a system type you rarely size. If the RTO assesses you as competent in every unit, it issues the qualification.
Plumbers who also build may want to read about the NSW Builder's Licence RPL pathway. For what shapes the price, see the Certificate IV RPL cost guide.